Aqualand's in-house construction arm have been hard at work bringing this iconic Sydney Harbour project to life.
The construction of Blue is a challenging refurbishment with several construction staging hurdles. Converting a commercial building into a luxury residential masterpiece takes incredible craftsmanship, that is why Aqualand appointed the best construction team to achieve a fast-track construction program whilst maintaining the original design intent, and exceeding expectations!
Tried and Tested. Meet the team building this iconic project:
Developer & Builder: Aqualand Australia | Architect: PTW Architects | Structural Engineer: BG&E Engineers | Structural Peer Reviewer: Robert Bird Group